Request for Determination of Applicability 1. John Delisio, 15 Bay Road, Proposed repair of a rock revetment by placing small stones between existing gaps in coastal bank, velocity flood zone, and the buffer zone to a coastal beach.
00:02:00
Request for Approval of a Revised Plan 2. SE83-2341 Kieran Healy, BSC Group for Paul & Anna Spuria Tr, 3 Windemere Permitted raze and replace of existing dwelling and new septic system in buffer zone to coastal bank, riverfront area and LSCSF- proposed revision to expand patio by 2 feet seaward.
00:18:33
Continued Notice of Intent 3. SE83-2403 Paul and Nancy Cruz, 52 Prince Road after the fact filing for unpermitted patios, rinsing station, and gravel hardscape in land subject to coastal storm flowage and the buffer zones to a coastal bank and salt marsh
00:22:15
4. SE83-2417 Mark Burgess for Joseph and Meredith Zona 39 Seth Lane Proposed removal of concrete sea wall, groin modifications, regrading, and beach nourishment in coastal bank, coastal beach, land under the ocean, LSCSF, and riverfront area
00:25:44
Request to Amend an Order of Conditions 5. SE83-2340 Wayne Tavares, Wet Tech Land Design for Aleksandr Nemanov, 2 Buttercup Lane, Raze and replace of a single-family dwelling, proposed amendment to add construction of coastal stairway, addition of bulkhead and window wells, relocation and additional mitigation
00:35:05
SE83- 2421 Bob Perry, Cape Cod Engineering for Robert and Ann Childs 154 South Street Proposed reconstruction of an existing pier, platform, ramp and float in land under the ocean and land containing shellfish
00:36:10
Roby Whitehouse Town of Yarmouth DPW, 125 Seagull Beach Proposed beach raking and management in land subject to coastal storm flowage, barrier beach- coastal beach, and barrier beach- coastal dune
00:53:50
SE83-2420 Horsely Witten Group and APCC for Jeff Colby Town of Yarmouth DPW Follins Pond Road and Gun Rock Road, Proposed stormwater retrofit of the road and boat ramp with porous pavement and green stormwater infrastructure in coastal bank, land subject to coastal storm flowage, and the buffer zone to a salt marsh and coastal bank.
01:05:23
Karilyn Heisen, CDM Smith, and Horsley Witten Group for Jeff Colby Town of Yarmouth DPW 99 Buck Island Road Proposed discharge of highly treated effluent from the water resource recovery facility into recharge basins that may impact bordering vegetated wetlands, land subject to flooding, and the riverfront area by increasing water levels
01:30:20
There are currently no upcoming air times.