Lourival Santos, 96 South Shore Drive. Proposed addition in LSCSF
00:30SE83-2514 Crawford Land Management for Scott Peterson, 10 & 20 Susan Road. Proposed bank stabilization using coir fiber rolls and invasive tree removal in coastal bank and LSCSF.
04:10SE83-2525 Down Cape Engineering for Ann and Robert Wiggins, 61 Pheasant Cove Circle. Proposed addition in LSCSF and the buffer zone to a BVW, and after-the-fact filing for a boardwalk and deck in the BVW and velocity flood zone.
19:10SE83-2532 Down Cape Engineering for Robert Griffin, 0 Great island Rd. After-the-fact filing for replacement stairs and boardwalk on coastal dune and LSCSF.
28:10SE83-75 BSC Group for Steven Katz, 703 Route 28
01:01:10SE83-2017 Down Cape Engineering for John Fedele, 166 Blue Rock Road
01:18:10SE83-76 Down Cape Engineering for Anthony Campagna, 14 Compass Drive
01:21:10SE83-2322 Down Cape Engineering for Christopher C. Hooven, 12 Railway Bluffs
01:26:10SE83-2266 Down Cape Engineering for Mark C. Stoever, 172 Blue Rock Road
01:33:10