83-2310 BSC Group for Valentina and Mircha Karcha, 52 Wilfin Road. Proposed rinse station in buffer zone to a BVW.
00:20SE83-2516 Atlantic Coast Engineering for J. Scott Martin, 104 & 110 River Street. Proposed pier, ramp, and float system in riverfront area, land under the ocean, coastal bank, land containing shellfish, and LSCSF. (Continuance requested to 8/20/2026)
06:10SE83-2538 Shorefront Consulting for Blue Rock Road Realty Trust, 166 and 172 Blue Rock Road. Proposed bulkhead and stairs reconstruction with new landing in coastal beach, coastal bank, land containing shellfish, riverfront area and LSCSF. (discuss peer review report)
06:55SE83-2540 Shorefront Consulting for Jason and Tina Lilly, 143 Mayflower Terrace. Proposed reconstruction of a seawall further landward, and new fiber roll array in riverfront area, coastal beach, coastal bank, and LSCSF. (Continuance requested to 8/6/2026)
42:30SE83-2533 Shorefront Consulting for Thomas Dandis, 7 Cape Isles Drive. Proposed seawall reconstruction at the same elevation and float configuration in land under the ocean and land containing shellfish and after-the-fact filing for a patio and walkway in the buffer zone and LSCSF
43:00SE83-2534 Shorefront Consulting for Anthony and Jane Campagna, 14 Compass Drive. Proposed seawall reconstruction, elevation, and relocation with fill in land under the ocean, land containing shellfish, riverfront area, LSCSF and the buffer zone to a salt marsh, and after- the-fact filing for a patio and deck in the buffer zone to a salt marsh and LSCSF
49:50SE83-2541 Down Cape Engineering for Gold Village Waterside LLC, 679 & 681 Route 28. Proposed stone revetment with fill in riverfront area, land under the ocean, coastal bank, land containing shellfish, and LSCSF.
55:37Cape Cod Engineering for Lisa Garcia and Miriam Gelfer, 689 Willow Street. After-the-fact filing for a patio in riverfront area, LSCSF, and the buffer zone to a BVW
01:08:55SE83-1204 Cape Cod Engineering for Yiping Ding, 185 Cranberry Ln.
01:23:50SE83-1713 Cape Cod Engineering for Yiping Ding, 185 Cranberry Ln.
01:51:02SE83-2307 Down Cape Engineering for Karleen and Richard Oberton, 4 River Drive
01:56:22SE83-2438 Down Cape Engineering for Michael Dodd, 158 Pleasant Street.
01:58:19SE83-2545 Down Cape Engineering for Karleen and Richard Oberton, 4 River Drive. Proposed inground pool in riverfront area, LSCSF, and the buffer zone to a coastal bank.
01:59:30Francis Poli, 57 Lewis Bay Road. Unpermitted construction of a retaining wall and removal of vegetation within LSCSF, RFA, and the buffer zones to a coastal bank and salt marsh.
02:15:50